Utilities

Summer Projects 2009
Byemoor & Endiang
  • Commission new water reservoirs
  • Abandon well at Endiang
  • Install water sampling / flush station combination in both
  • Install and replace child-proof fencing and gate between Lagoon and Waste Transfer Site
  • Cut bush back from Lift Station Building
  • Expose paved over manhole covers in Hamlet to improve access
  • Replace lids with manhole covers on lagoon drains
  • Flush sanitary sewer mains

Buffalo Sands
  • Install storm sewer manholes over storm connections

Botha
  • Flush water mains and test / service fire hydrants
  • Flush sanitary sewer mains
  • Cut grass at sewer lagoon first time

Erskine
  • Flush sanitary sewers with sewer flusher truck

Shirley McClellan Regional Water Services Commission
  • Commission new water line
  • Operate water line from Stettler to Consort

Service & Utilities (2007)
Water Distributed
Location
Meters Cubed
Buffalo Sands
2,036
Byemoor  5,581
Endiang
2,300

Water Mains Maintained
Location Meters
Buffalo Sands
900
Byemoor 2,500
Endiang 950

Water Storage Capacity
Location Meters Cubed
Buffalo Sands 100
Byemoor
23
Endiang
23

Wastewater Collection Pipes Maintained
Location
Meters
Buffalo Lake 1,050
Byemoor 2,460
Endiang 1,037
Erskine 8,118

Additional Items Maintained
Item Maintained
Number Maintained
Wastewater Lagoons
3
Wells
4