Utilities
Emergency Contact
Steven Lockhart - (403) 740-9572
Randy Chmelnyk - (403) 740-6827
Summer Projects 2009
Byemoor & Endiang
- Commission new water reservoirs
- Abandon well at Endiang
- Install water sampling/flush station combination in both
- Install & replace child-proof fencing and gate between Lagoon and Waste Transfer Site
- Cut bush back from Lift Station Building
- Expose paved over manhole covers in Hamlet to improve access
- Replace lids with manhole covers on lagoon drains
- Flush sanitary sewer mains
Buffalo Sands
- Install storm sewer manholes over storm connections
Botha
- Flush water mains and test/service fire hydrants
- Flush sanitary sewer mains
- Cut grass at sewer lagoon first time
Erskine
- Flush sanitary sewers with sewer flusher truck
Shirley McClellan Regional Water Services Commission
- Commission new water line
- Operate water line from Stettler to Consort
Service and Utilities (2007)
Water Distributed
Byemoor 5581 m3
Endiang 2300 m3
Buffalo Sands 2036 m3
Water Mains Maintained
Byemoor 2500 m
Endiang 950 m
Buffalo Sands 900 m
Wells Maintained 4
Water Storage Capacity
Byemoor 23 m3
Endiang 23 m3
Buffalo Sands 100 m3
Wastewater Lagoons Maintained 3
Wastewater Collection Pipes Maintained
Buffalo Lake 1050 m
Erskine 8118 m
Byemoor 2460 m
Endiang 1037 m
|